Current Project:

Contract CL-6....Engineer: Paul Kelly tel 729-5033.....Contractor: W. Walsh Co., Inc.

Streets Under Construction:

PAWTUCKET:
 
 

Our contractor W. Walsh Co., Inc. (CL-6) of Attleboro will do this work.  They will be cleaning and lining existing water mains in the street and replacing any non-standard house services to the property line.  All roads, sidewalks, and lawns will be repaired as soon as possible.  All addresses in the area that will be affected by a scheduled shutdown will be notified in advance.  Some rusty water may occur in the area, allow water to run for a short time until clear.  We are sorry for the inconvenience, please bear with us.  Thank you.

PWSB employees and the Contractor’s employees will need access to the houses on the streets being worked on.  All employees are required to carry a Photo I. D.  If you have any questions or concerns, please call 729-5033.

 

Current Project:

Contract MR-10....Engineer: Paul Kelly tel 729-5033.....Contractor: C. B. Utility Co., Inc.

Streets Under Construction:

CENTRAL FALLS: PAWTUCKET:
Central St Lily Pond St
Clay St East Ave
   
   

Our contractor C. B. Utility Co., Inc. (MR-10) of Bristol will do this work.  They will be cleaning and lining existing water mains in the street and replacing any non-standard house services to the property line.  All roads, sidewalks, and lawns will be repaired as soon as possible.  All addresses in the area that will be affected by a scheduled shutdown will be notified in advance.  Some rusty water may occur in the area, allow water to run for a short time until clear.  We are sorry for the inconvenience, please bear with us.  Thank you.

PWSB employees and the Contractor’s employees will need access to the houses on the streets being worked on.  All employees are required to carry a Photo I. D.  If you have any questions or concerns, please call 729-5033.